Oway for Mining and Materials

Mines run on equipment, stockpiles and haulage that rarely share one plan. Oway connects them from pit to port, so every load, queue and rail car is coordinated against production and contracts.

Request a DemoStart Free

Log in now and access Oway OS and Juno for free.

Mining and Materials
Use case

Haul cycles

Measure every load, queue and cycle to cut idle time across the fleet.

  • Every cycle measured by stage
  • Queues predicted before they form
  • Juno reassigns trucks between shovels
IOIJuno
Overhead view of dump trucks, excavators and haul roads in a mining yard.
Haul cycle time by stageMinutes · Illustrative data
BeforeWith Oway
051015QueueLoadHaulDumpReturn
Haul cycle time by stage
BeforeWith Oway
Queue9.43.2
Load3.12.9
Haul12.612.1
Dump1.81.6
Return10.29.4
Use case

Equipment utilization

See which assets are working, waiting or down, and what each hour of downtime costs.

  • Working, waiting and down time per asset
  • Cost of every hour of downtime
  • Maintenance planned around production
IOIOway OS
Aerial view of an excavator loading rock into a mobile crusher in a quarry.
Utilization by asset classShare of available hours working · Illustrative data
Haul trucks78%Excavators71%Loaders64%Drills58%Dozers46%
Utilization by asset class
Utilization
Haul trucks78%
Excavators71%
Loaders64%
Drills58%
Dozers46%
Use case

Stockpile inventory

Track tonnage, grade and location for every stockpile against demand.

  • Tonnage and grade by stockpile
  • Committed demand against what is on hand
  • Blending plans from live data
IOI
Aerial view of gray aggregate stockpiles connected by conveyor belts.
Stockpile against committed demandThousand tonnes · Illustrative data
StockpileCommitted demand
300350400450500JanFebMarAprMayJun462455
Stockpile against committed demand
StockpileCommitted demand
Jan412380
Feb438395
Mar451420
Apr430436
May446441
Jun462455
Use case

Outbound coordination

Schedule rail and truck movements against production and contract commitments.

  • Rail and truck slots planned against output
  • Contract commitments tracked by shipment
  • Delays rerouted before they cost demurrage
JunoOway OS
Outbound coordination
Rail cars loaded on scheduleShare of cars · Illustrative data
0255075100JanFebMarAprMayJun94%
Rail cars loaded on schedule
On schedule
Jan71%
Feb74%
Mar82%
Apr88%
May91%
Jun94%
A painting of a long-haul truck on an open road at dusk.

Use Oway for